Stages

Understand stages in KanbanWP, the columns that show where each task is in your process, and how they relate to statuses and workflow.

A stage is one step in your workflow. On the kanban board, each stage is a column, and a task sits in exactly one stage at a time. If you have used other tools, stages are the same idea as columns, statuses or lists. KanbanWP uses the word “stage” everywhere.

Stages on a KanbanWP board

What a stage has

  • A name, such as Drafting or In Review.
  • A color, shown as a colored edge on the stage header and as the bar color in the Timeline view.
  • A WIP limit, an optional cap on how many tasks should be in the stage. 0 means no limit. See WIP limits.
  • A position that sets the left to right order on the board.

The header of each stage also shows a count of the tasks in it.

Where stages come from

When you create a board you pick a template, and the template creates the stages for you. Editorial gives you Ideas through Published, Sales gives you Lead through Lost, and so on. A duplicated board gets copies of the original’s stages.

Change the stages of a board

Admins and members can change stages on the Kanban view of the board.

  • Add a stage: click + Add stage at the right end of the board, enter a name, pick a color and an optional WIP limit, and click Add. The new stage goes at the end.
  • Rename a stage or change its color or WIP limit: click the ⋯ button in the stage header, edit the fields and click Save. The color picker was added in version 1.0.3.
  • Reorder stages: click ⋯ and use ← Move left or Move right →.
  • Delete a stage: click ⋯ and then Delete stage. The tasks in the deleted stage, archived ones included, move to the first remaining stage. A board needs at least one stage, so the only stage left on a board can’t be deleted. KanbanWP shows “A board needs at least one stage. Add another stage before deleting this one.”
  • Set the linked post’s status: board admins also see “When a card enters this stage, set the linked post to:” in the stage options. See linking cards to WordPress posts.

Stage options for the Drafting stage with the stage name, stage color, WIP limit and the linked post status select

The last stage on the board is the done stage. A task is complete while it sits in that stage. It gets a completion date when it moves in, and Reports use the completion date for cycle time. When you add, reorder, archive or delete stages, KanbanWP marks tasks complete or not complete again to match the new last stage. A task marked complete this way gets the time it was last changed as its completion date, so moving a stage away and back doesn’t reset the completion dates to today. If you add a stage after Done, the new stage becomes the done stage and the tasks in Done are reopened, so move the new stage left if that is not what you want.

Developers can do the same through the REST API, which has endpoints to create, update, delete and reorder stages.

Moving tasks between stages

  • Drag a card to another stage, or to a new position in the same stage. The card lands where you drop it.
  • Use the keyboard: press Space on a card to lift it, move it with the arrow keys, and press Enter or Space to drop it. See managing tasks.
  • In the List and Table views, the stage is shown for each task, and you can change it from the task panel.

Screen readers announce each move, whether you drag the card or use the keyboard.

Each move is recorded in the board’s activity feed.

Stages and views

Stages are most visible in the Kanban view. The List view groups tasks under their stage names, the Table view has a Stage column that you can sort by, and the Timeline view colors bars by stage. The Calendar and My Tasks views focus on dates and assignees instead. See Views.

Last updated November 10, 2026

Get KanbanWP updates

Release notes, new features and kanban guides, straight to your inbox. We write when something ships, not on a schedule.